Troy Regional predictions

Rohbino

Well-known member
Was the small loop under the bridge taken out and made up elsewhere? The pics posted above showed a lot of standing water but I am assuming that most or all of that drained by race time. Overall the times were faster than I thought they would be.
 
Runners were rerouted around the standing water under the bridge. Mulch was put down, but still sloppy. Hats off to the meet manager and staff for doing what they could in order to not make major course changes.
 
.
Top